Site Induction & Access Procedure

Mildura Shine Co · ABN 72 767 892 925 · MSC-PRO-01 · v1.2 · Issued 23 Jul 2026 · Revised 31 Aug 2026 · Review: annual · Authorised: Owner/Operator

What we bring to every commercial engagement (the contractor pack)

Status note (31 Aug 2026): Mildura Shine Co is registered and holds ABN 72 767 892 925. The items below are the standard contractor pack. Those marked [not held] are not yet held and will not be represented as held — read every item in the list below and check its marking. No commercial engagement requiring an item marked [not held] will be accepted until it is in hand.

Inductions

Site access rules we follow

StageStandard practice
Before attendanceScope, access windows, isolation needs (e.g. window locks, alarms, dogs) and site rules confirmed in writing; day-before notification sent
On arrivalSign in (site register/portal); identify to site contact; verify agreed scope unchanged; pre-start check per WHS Policy (powerline survey, public protection, water/drain plan)
During workWork zone managed (cones/signage where hoses cross public paths); site rules observed where stricter than ours; variations agreed in writing before extra work
On completionWalk-through offered; after-photos to job file; sign out; site left secure (gates, locks, alarms as found)
Keys & codesHeld only under written arrangement, stored separately from address records, returned or destroyed on engagement end
Signed: ____________________ Owner/Operator · Date: ____ / ____ / 2026 · Next review: July 2027